• Location
    Wilford Bridge level crossing, Melton
  • Cause
    Major works on rail
  • Responsibility
    Network Rail
  • Effective
    25/10/2025 - 29/10/2025

The level crossing at Wilford bridge will be closed from  20:00 on Friday 24th October 2025 until 06:00 on Wednesday 29th October 2025. This is not (as is usual) a series of overnight closures but is a full closure for the entire period due to the scale of the work involved.

As a result services 70 and 800 Park and Ride will be severely disrupted beyond Woodbridge.Both services will operate their usual route as far as Melton and then via Station Road and Melton Chapel. 

For passengers travelling to and from the area east of Melton a free shuttle bus, funded by Suffolk County Council will be provided although this will be a much reduced timetable due to the length of the diversion. The shuttle will operate via Campsea Ashe, Tunstall, Rendlesham, Eyke to Sutton Heath, Rock Barracks.

In order to complete their journey passengers may need to change bus at Woodbridge Turban Centre.

Wilford bridge shuttle

Passengers are advised to allow significantly longer for their journey and to plan ahead

Share this