Wilford Bridge Level Crossing, Melton (services 800/70)
Ipswich
-
LocationWilford Bridge Level Crossing, Melton
-
CauseMajor works on Railway
-
ResponsibilityNetwork Rail
-
Effective06/12/2025 - 06/12/2025
he level crossing at Wilford bridge will be closed from 20:00 on Friday 5th December 2025 until 18:00 on Saturday 6th December 2025. This is a full closure for the entire period due to the scale of the work involved.
As a result, on the Saturday services 70 and 800 Park and Ride will be severely disrupted beyond Woodbridge. Both services will operate their usual route as far as Melton and then via Station Road and Melton Chapel.
For passengers travelling to and from the area east of Melton a free shuttle bus, funded by Suffolk County Council will once again be provided although this will be a much reduced timetable due to the length of the diversion (see timetable below). The shuttle will operate via Campsea Ashe, Tunstall, Rendlesham, Eyke to Sutton Heath, Rock Barracks.
In order to complete their journey passengers may need to change bus at Woodbridge Turban Centre.
Passengers are advised to allow significantly longer for their journey and to plan ahead
