Share this

To allow for cabling works, from Monday 9th March until Saturday morning 14th March (or if works finish earlier), Dumbarton Road at Dunglass roundabout will be closed overnight only:

Share this

Temporary Stop Closure, route 9A, Rowner Crossroads, Gosport.
0930 – 1600 Wednesday 4th March.

Due to road works, the above stop will be closed on the date above.
Passengers are advised to use the temporary stop provided by the works contractors.
This closure will affect the stop in both directions.

First Bus has announced that plans are in full swing as it prepares to take over the running of  the X25 and X25A express services between Cumbernauld and Glasgow in less than five weeks.

The operator is busy preparing a fresh set of vehicles to be used on the routes which will be fitted with the latest ticketing technology, installed as part of an overall £20m investment by First Bus across its UK fleet, and charging points for digital connectivity.

First Bus begins the services in place of Stagecoach on Easter Sunday 5 April.

Share this

Due to South Cheriton being closed for water works between the hours of 09:30 and 15:30 for today and tomorrow

Service 58 will not be able to serve South Cheriton, Horsington and Templecombe in both directions for the duration of the closure.

Updated for the 58 service

South Cheriton is now open, Service 58 will now revert back to its normal route.


Last updated 03/03/2026 11:30 am. 

Opco
Share this

Victoria Bridge is currently closed.

Gorbals St/Victoria Bridge SERVICES AFFECTED: 5, 6, 7, 7A, 21, 31, 65, 75, 267

5, 6, 7, 7A, 21, 31, 75, 267Northbound towards the city: 

The services are diverting via Gorbals Street, Ballater Street, Crown Street, Clyde Street, Stockwell St/Bridgegate, normal route.

Share this

The services are currently experiencing traffic delays.

Share this

Due to an incident on King Lane/ Nursery Lane, the services are experiencing delays.

Share this

To carry out the works safely, the approach lanes of Rawdon Road to Horsforth Roundabout will be closed, requiring a complex temporary traffic light system to be installed on the roundabout to manage traffic and pedestrians

The works are to commence at 1900hrs Friday 6th March and will continue over the weekend with the aim to be removed by 0600hrs Monday 9th March 2026

Share this

Temporary traffic lights are being installed intermittently on Rectory Road/Wickford Avenue, Pitsea. Due to carriageway incursion - the B4 is unable to navigate Rectory Road/Wickford Avenue, Pitsea safely. The permit's end date is: 31 Mar 2026. 0900-1530

These are rolling roadworks - the B4 will be placed on diversion on a case-by-case basis. The B4 will divert in both directions via Pitsea Road. The following bus stops will not be served in both directions:

Opco
Share this

Temporary traffic lights have been installed on Bridgwater Drive, Westcliff-on-Sea. Due to carriageway incursion - the 20 is unable to navigate Bridgwater Drive safely.

The permit's end date is: 4 Mar 23:38 GMT.

The 20 will be placed on diversion until further notice:

Towards Southend-on-Sea: Normal line of route. All bus stops served.

Towards Hullbridge: The 20 will divert via divert via Prince Avenue (A127) and Southbourne Grove. The following bus stops will not be served:

Opco